亚洲va中文字幕欧美不卡-亚洲va在线va天堂成人-亚洲va在线va天堂va手机-亚洲va在线va天堂va888www-久一视频在线-久污tv

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁(yè) News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 四虎永久免费影院在线 | 日本一二区在线观看 | 视频一区视频二区在线观看 | 天天干夜夜玩 | 亚洲视频第一页 | 三级国产三级在线 | 日本在线观看高清不卡免v 日本在线观看a | 日韩精品久久久免费观看夜色 | 婷婷开心| 四虎永久免费最新在线 | 日本高清视频在线观看 | 亚洲欧美一区二区三区麻豆 | 在线亚洲综合 | 亚洲视频在线观 | 亚洲 欧美 精品 中文第三 | 亚洲视频在线免费看 | 色99色| 欧美在线视频网 | 日韩三级免费看 | 天天碰人人 | 性欧美暴力猛交69hd | 青青草视频黄色 | 四虎在线免费播放 | 天堂中文资源在线地址 | 在线观看国产一区二区三区 | 亚洲欧美风情 | 五福影院在线 | 日韩欧美亚洲综合 | 欧美无人区码卡二卡3卡4免费 | 四虎成人精品免费影院 | 日韩 欧美 亚洲 国产 | 欧美中文字幕视频 | 午夜精品福利视频 | 欧美一级视频在线观看 | 四虎影院成人在线观看 | 天天狠天天透天干天天怕处 | 中文字幕精品亚洲无线码二区 | 欧美综合区 | 天堂精品 | 香蕉久久夜色精品国产小优 | 天天狠狠色噜噜 |